Switchgear enamel

$21.48 / EA

PT-101 · MasterFormat 09 91 00 · EA

What’s in this rate

This unit is applying one Switchgear enamel. The painter preps the work area, completes the work as specified, and leaves the unit ready for the next operation. The rate is per each. Related field work, removals, and specialty transitions are separate units.

Includes

  • switchgear enamel coating with waste
  • prep, layout, and application or set as specified
  • small tools

Excludes

  • removals / tear-off
  • unrelated field systems
  • substrate repair beyond preparation

Build-up

Labor 0.34 hr × $42.00 wage and burden
$14.28
Material and small tools
$3.47
Direct rate (labor, material, and tools)
$17.75 / EA
Overhead 10% of direct
$1.78
Fee 10% of (direct and overhead)
$1.95
Loaded rate
$21.48 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.