PVC 60-mil fleeceback mech

$323.37 / SQ

RF-215 · MasterFormat 07 54 00 · SQ

What’s in this rate

This unit covers PVC 60-mil fleeceback mech, measured per square. The roofer stages the fleeceback membrane, installs plates and fasteners to the deck pattern, and heat-welds field seams. The rate covers the listed material, 5.00% material waste, labor, and small tools. insulation, coverboard, adhered attachment, ballasted attachment, flashing, penetrations are separate units.

Includes

  • 60-mil fleeceback PVC field membrane with plates and fasteners for mechanical attachment
  • layout, ordinary surface preparation, and installation described above
  • stated material waste and small tools

Excludes

  • insulation
  • coverboard
  • adhered attachment
  • ballasted attachment
  • flashing
  • penetrations
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 1.6 hr × $65.00 wage and burden
$104.00
Material and small tools
$163.25
Direct rate (labor, material, and tools)
$267.25 / SQ
Overhead 10% of direct
$26.72
Fee 10% of (direct and overhead)
$29.40
Loaded rate
$323.37 / SQ

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.