Precast coping cap

$75.93 / LF

RF-197 · MasterFormat 07 62 00 · LF

What’s in this rate

This unit covers Precast coping cap, measured per linear foot. The roofer or mason sets the precast coping on the prepared parapet, aligns joints, and seals the joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. stone coping cap, metal parapet cap, gravel stop, fascia, expansion cover, wall repair are separate units.

Includes

  • precast concrete coping cap with setting bed and joint sealant
  • layout, ordinary surface preparation, and installation described above
  • stated material waste and small tools

Excludes

  • stone coping cap
  • metal parapet cap
  • gravel stop
  • fascia
  • expansion cover
  • wall repair
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.35 hr × $65.00 wage and burden
$22.75
Material and small tools
$40.00
Direct rate (labor, material, and tools)
$62.75 / LF
Overhead 10% of direct
$6.28
Fee 10% of (direct and overhead)
$6.90
Loaded rate
$75.93 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.