Scupper conductor head
$298.57 / EA
RF-148 · MasterFormat 07 72 00 · EA
What’s in this rate
This unit covers Scupper conductor head, measured per each. The roofer sets and secures the head at the prepared scupper, seals the interface, and verifies drainage. The rate covers the listed material, 5.00% material waste, labor, and small tools. Through-wall scupper, downspout, wall cutting, overflow assembly, access equipment, finish repair are separate units.
Includes
- prefabricated sheet-metal conductor head with flange, outlet, fasteners, and sealant
- layout, ordinary surface preparation, and installation described above
- stated material waste and small tools
Excludes
- through-wall scupper
- downspout
- wall cutting
- overflow assembly
- access equipment
- finish repair
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.2 hr × $65.00 wage and burden
- $78.00
- Material and small tools
- $168.75
- Direct rate (labor, material, and tools)
- $246.75 / EA
- Overhead 10% of direct
- $24.68
- Fee 10% of (direct and overhead)
- $27.14
- Loaded rate
- $298.57 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
