Overflow box scupper
$271.65 / EA
RF-163 · MasterFormat 07 72 00 · EA
What’s in this rate
This unit covers Overflow box scupper, measured per each. The roofer sets and secures the overflow box at the prepared opening, seals the interface, and verifies free discharge. The rate covers the listed material, 5.00% material waste, labor, and small tools. Through-wall primary scupper, conductor head, downspout, wall cutting, secondary drain, access equipment are separate units.
Includes
- prefabricated sheet-metal overflow box scupper with flange, outlet, fasteners, and sealant
- layout, ordinary surface preparation, and installation described above
- stated material waste and small tools
Excludes
- through-wall primary scupper
- conductor head
- downspout
- wall cutting
- secondary drain
- access equipment
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.1 hr × $65.00 wage and burden
- $71.50
- Material and small tools
- $153.00
- Direct rate (labor, material, and tools)
- $224.50 / EA
- Overhead 10% of direct
- $22.45
- Fee 10% of (direct and overhead)
- $24.70
- Loaded rate
- $271.65 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
