Through-parapet scupper

$232.02 / EA

RF-179 · MasterFormat 07 72 00 · EA

What’s in this rate

This unit covers Through-parapet scupper, measured per each. The roofer cuts the parapet opening, sets the scupper sleeve, seals flanges to the roofing and wall face, and checks free discharge. The rate covers the listed material, 5.00% material waste, labor, and small tools. Overflow box scupper, through-wall scupper, primary drain, secondary drain, conductor head are separate units.

Includes

  • through-parapet scupper sleeve with flanges, fasteners, and sealant
  • layout, ordinary surface preparation, and installation described above
  • stated material waste and small tools

Excludes

  • overflow box scupper
  • through-wall scupper
  • primary drain
  • secondary drain
  • conductor head
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 1 hr × $65.00 wage and burden
$65.00
Material and small tools
$126.75
Direct rate (labor, material, and tools)
$191.75 / EA
Overhead 10% of direct
$19.18
Fee 10% of (direct and overhead)
$21.09
Loaded rate
$232.02 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.