Receiver termination bar

$28.24 / LF

RF-210 · MasterFormat 07 62 00 · LF

What’s in this rate

This unit covers Receiver termination bar, measured per linear foot. The roofer sets the receiver termination bar over the membrane edge, fastens it to the substrate, and seals the top edge for counterflashing reception. The rate covers the listed material, 5.00% material waste, labor, and small tools. stainless termination bar, aluminum termination bar, surface-mount counterflashing, thru-wall flashing, reglet are separate units.

Includes

  • receiver termination bar with fasteners and sealant
  • layout, ordinary surface preparation, and installation described above
  • stated material waste and small tools

Excludes

  • stainless termination bar
  • aluminum termination bar
  • surface-mount counterflashing
  • thru-wall flashing
  • reglet
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.14 hr × $65.00 wage and burden
$9.10
Material and small tools
$14.24
Direct rate (labor, material, and tools)
$23.34 / LF
Overhead 10% of direct
$2.33
Fee 10% of (direct and overhead)
$2.57
Loaded rate
$28.24 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.