Sprinkler head relocation

$100.55 / EA

FP-D2-005 · MasterFormat 21 13 00 · EA

What’s in this rate

This unit covers Sprinkler head relocation, measured per each. In tenant improvement work the sprinkler fitter removes the existing pendent head, installs an arm-over or re-cut drop, and reinstalls the head at the new ceiling layout location. The rate covers the listed material, 5.00% material waste, labor, and small tools. System drain-down and refill, new heads, new branch lines, and ceiling patching are separate units.

Includes

  • remove and reinstall one pendent head at new location
  • arm-over nipples / fittings and new escutcheon
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • sprinkler-system-drain-refill (separate unit)
  • new head material (priced by head type)
  • flexible-sprinkler-drop (live)
  • ceiling tile / patching (ACT/drywall)
  • hydraulic re-calculation
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.85 hr × $70.00 wage and burden
$59.50
Material and small tools
$23.60
Direct rate (labor, material, and tools)
$83.10 / EA
Overhead 10% of direct
$8.31
Fee 10% of (direct and overhead)
$9.14
Loaded rate
$100.55 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.