Sprinkler head relocation
$100.55 / EA
FP-D2-005 · MasterFormat 21 13 00 · EA
What’s in this rate
This unit covers Sprinkler head relocation, measured per each. In tenant improvement work the sprinkler fitter removes the existing pendent head, installs an arm-over or re-cut drop, and reinstalls the head at the new ceiling layout location. The rate covers the listed material, 5.00% material waste, labor, and small tools. System drain-down and refill, new heads, new branch lines, and ceiling patching are separate units.
Includes
- remove and reinstall one pendent head at new location
- arm-over nipples / fittings and new escutcheon
- layout and installation described above
- stated material waste and small tools
Excludes
- sprinkler-system-drain-refill (separate unit)
- new head material (priced by head type)
- flexible-sprinkler-drop (live)
- ceiling tile / patching (ACT/drywall)
- hydraulic re-calculation
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.85 hr × $70.00 wage and burden
- $59.50
- Material and small tools
- $23.60
- Direct rate (labor, material, and tools)
- $83.10 / EA
- Overhead 10% of direct
- $8.31
- Fee 10% of (direct and overhead)
- $9.14
- Loaded rate
- $100.55 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
