Sprinkler branch line restraint

$15.76 / EA

FP-D1-018 · MasterFormat 21 13 00 · EA

What’s in this rate

This unit covers Sprinkler branch line restraint, measured per each. The sprinkler fitter installs a listed restraint strap on the branch line to limit vertical and lateral movement. The rate covers the listed material, 3.00% material waste, labor, and small tools. Hangers, seismic braces, and ceiling restraint clips are separate units.

Includes

  • listed branch-line restraint
  • fastener allocation
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • sprinkler hangers (clevis / band / beam clamp)
  • sprinkler-seismic-brace / -four-way
  • act-seismic-clip / act-seismic-brace-clip (ceilings)
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.12 hr × $70.00 wage and burden
$8.40
Material and small tools
$4.63
Direct rate (labor, material, and tools)
$13.03 / EA
Overhead 10% of direct
$1.30
Fee 10% of (direct and overhead)
$1.43
Loaded rate
$15.76 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.