Sprinkler branch line restraint
$15.76 / EA
FP-D1-018 · MasterFormat 21 13 00 · EA
What’s in this rate
This unit covers Sprinkler branch line restraint, measured per each. The sprinkler fitter installs a listed restraint strap on the branch line to limit vertical and lateral movement. The rate covers the listed material, 3.00% material waste, labor, and small tools. Hangers, seismic braces, and ceiling restraint clips are separate units.
Includes
- listed branch-line restraint
- fastener allocation
- layout and installation described above
- stated material waste and small tools
Excludes
- sprinkler hangers (clevis / band / beam clamp)
- sprinkler-seismic-brace / -four-way
- act-seismic-clip / act-seismic-brace-clip (ceilings)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.12 hr × $70.00 wage and burden
- $8.40
- Material and small tools
- $4.63
- Direct rate (labor, material, and tools)
- $13.03 / EA
- Overhead 10% of direct
- $1.30
- Fee 10% of (direct and overhead)
- $1.43
- Loaded rate
- $15.76 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
