Sprinkler seismic separation assembly
$1,282.72 / EA
FP-D2-015 · MasterFormat 21 13 00 · EA
What’s in this rate
This unit covers Sprinkler seismic separation assembly, measured per each. The sprinkler fitter installs the listed seismic separation assembly where the FP main crosses a building seismic or expansion joint, with supports per the listing. The rate covers the listed material, 0.00% material waste, labor, and small tools. Seismic braces, hangers, expansion joint covers, and seismic design are separate units.
Includes
- listed seismic separation assembly
- assembly supports / fasteners
- layout and installation described above
- stated material waste and small tools
Excludes
- sprinkler-seismic-brace (live) / -four-way
- expansion-joint-cover / roof-expansion-joint-* (other trades)
- expansion-loop-domestic (plumbing)
- seismic design / calcs
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 3 hr × $70.00 wage and burden
- $210.00
- Material and small tools
- $850.10
- Direct rate (labor, material, and tools)
- $1,060.10 / EA
- Overhead 10% of direct
- $106.01
- Fee 10% of (direct and overhead)
- $116.61
- Loaded rate
- $1,282.72 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
