Sprinkler seismic separation assembly

$1,282.72 / EA

FP-D2-015 · MasterFormat 21 13 00 · EA

What’s in this rate

This unit covers Sprinkler seismic separation assembly, measured per each. The sprinkler fitter installs the listed seismic separation assembly where the FP main crosses a building seismic or expansion joint, with supports per the listing. The rate covers the listed material, 0.00% material waste, labor, and small tools. Seismic braces, hangers, expansion joint covers, and seismic design are separate units.

Includes

  • listed seismic separation assembly
  • assembly supports / fasteners
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • sprinkler-seismic-brace (live) / -four-way
  • expansion-joint-cover / roof-expansion-joint-* (other trades)
  • expansion-loop-domestic (plumbing)
  • seismic design / calcs
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 3 hr × $70.00 wage and burden
$210.00
Material and small tools
$850.10
Direct rate (labor, material, and tools)
$1,060.10 / EA
Overhead 10% of direct
$106.01
Fee 10% of (direct and overhead)
$116.61
Loaded rate
$1,282.72 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.