Steel beam field cope

$64.33 / EA

SS-D3-011 · MasterFormat 05 12 00 · EA

What’s in this rate

This unit covers Steel beam field cope, measured per each. The ironworker lays out, torch-cuts, and grinds a field cope at one beam end to clear a supporting member. The rate covers the listed material, 5.00% material waste, labor, and small tools. Shop copes, connection hardware, and member erect are separate units.

Includes

  • cope layout / torch cut / grind
  • cutting / grinding consumables
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • shop fabrication copes
  • connections (shear / clip / seated)
  • member erect
  • fire watch / hot-work permit costs
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.8 hr × $58.00 wage and burden
$46.40
Material and small tools
$6.76
Direct rate (labor, material, and tools)
$53.16 / EA
Overhead 10% of direct
$5.32
Fee 10% of (direct and overhead)
$5.85
Loaded rate
$64.33 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.