Steel MC12 channel install

$32.16 / LF

SS-D1-025 · MasterFormat 05 12 00 · LF

What’s in this rate

This unit covers Steel MC12 channel install, measured per linear foot. The ironworker erects and installs MC12 miscellaneous steel channel. The rate covers the listed material, 5.00% material waste, labor, and small tools. Generic C-channel, angles, WF beams, strut channel, and connections are separate units.

Includes

  • MC12 channel delivery allocation
  • fasteners / bolt share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • steel-channel-install (live generic)
  • strut-channel-* / hat-channel-furring (not structural)
  • WF beams
  • field connections
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.14 hr × $58.00 wage and burden
$8.12
Material and small tools
$18.46
Direct rate (labor, material, and tools)
$26.58 / LF
Overhead 10% of direct
$2.66
Fee 10% of (direct and overhead)
$2.92
Loaded rate
$32.16 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.