Steel MC12 channel install
$32.16 / LF
SS-D1-025 · MasterFormat 05 12 00 · LF
What’s in this rate
This unit covers Steel MC12 channel install, measured per linear foot. The ironworker erects and installs MC12 miscellaneous steel channel. The rate covers the listed material, 5.00% material waste, labor, and small tools. Generic C-channel, angles, WF beams, strut channel, and connections are separate units.
Includes
- MC12 channel delivery allocation
- fasteners / bolt share
- layout and installation described above
- stated material waste and small tools
Excludes
- steel-channel-install (live generic)
- strut-channel-* / hat-channel-furring (not structural)
- WF beams
- field connections
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.14 hr × $58.00 wage and burden
- $8.12
- Material and small tools
- $18.46
- Direct rate (labor, material, and tools)
- $26.58 / LF
- Overhead 10% of direct
- $2.66
- Fee 10% of (direct and overhead)
- $2.92
- Loaded rate
- $32.16 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
