Steel stair landing

$620.69 / EA

SS-D1-030 · MasterFormat 05 51 00 · EA

What’s in this rate

This unit covers Steel stair landing, measured per each. The ironworker sets and installs the fabricated steel pan stair landing between flights. The rate covers the listed material, 5.00% material waste, labor, and small tools. Stair flights, concrete fill, handrail, guardrail, and paint are separate units.

Includes

  • steel pan stair landing delivery allocation
  • framing connection / fasteners share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • steel-stair-pan-install (flight)
  • concrete-stair-landing / concrete-stair-pan-fill
  • steel-handrail-pipe-install / steel-guardrail-install
  • paint-stair-landing-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 3.2 hr × $58.00 wage and burden
$185.60
Material and small tools
$327.36
Direct rate (labor, material, and tools)
$512.96 / EA
Overhead 10% of direct
$51.30
Fee 10% of (direct and overhead)
$56.43
Loaded rate
$620.69 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.