Stone coping masonry
$77.01 / LF
MS-042 · MasterFormat 04 40 00 · LF
What’s in this rate
This unit covers Stone coping masonry, measured per linear foot. The bricklayer sets stone or cast-stone masonry coping on the wall with mortar bedding and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. coping-metal-cap, parapet-coping, brick water table, through-wall flashing masonry are separate units.
Includes
- stone / cast-stone coping units
- setting mortar / bedding
- joint tooling and sealant allocation light
- layout and installation described above
- stated material waste and small tools
Excludes
- coping-metal-cap / parapet-coping (roof metal)
- through-wall flashing densify
- brick water table
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.45 hr × $52.00 wage and burden
- $23.40
- Material and small tools
- $40.25
- Direct rate (labor, material, and tools)
- $63.65 / LF
- Overhead 10% of direct
- $6.36
- Fee 10% of (direct and overhead)
- $7.00
- Loaded rate
- $77.01 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
