Stone coping masonry

$77.01 / LF

MS-042 · MasterFormat 04 40 00 · LF

What’s in this rate

This unit covers Stone coping masonry, measured per linear foot. The bricklayer sets stone or cast-stone masonry coping on the wall with mortar bedding and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. coping-metal-cap, parapet-coping, brick water table, through-wall flashing masonry are separate units.

Includes

  • stone / cast-stone coping units
  • setting mortar / bedding
  • joint tooling and sealant allocation light
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • coping-metal-cap / parapet-coping (roof metal)
  • through-wall flashing densify
  • brick water table
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.45 hr × $52.00 wage and burden
$23.40
Material and small tools
$40.25
Direct rate (labor, material, and tools)
$63.65 / LF
Overhead 10% of direct
$6.36
Fee 10% of (direct and overhead)
$7.00
Loaded rate
$77.01 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.