Structural steel bolt-up slip-critical

$530.34 / TN

SS-D1-021 · MasterFormat 05 12 23 · TN

What’s in this rate

This unit covers Structural steel bolt-up slip-critical, measured per ton. The ironworker completes slip-critical pretensioned field bolt-up of erected structural steel on a ton basis. The rate covers the listed material, 5.00% material waste, labor, and small tools. Snug-tight bolt-up, piece installs, welded moment connections, faying-surface prep, and bolt inspection are separate units.

Includes

  • slip-critical high-strength bolts / consumables allocation
  • pretensioning (turn-of-nut or TC) labor as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • structural-steel-bolt-up (live snug-tight)
  • piece installs (WF/HSS/joist/deck)
  • shop faying-surface prep
  • special inspection / testing
  • paint-structural-steel-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 5.6 hr × $58.00 wage and burden
$324.80
Material and small tools
$113.50
Direct rate (labor, material, and tools)
$438.30 / TN
Overhead 10% of direct
$43.83
Fee 10% of (direct and overhead)
$48.21
Loaded rate
$530.34 / TN