Surface raceway LD5

$8.91 / LF

LV-134 · MasterFormat 27 05 33 · LF

What’s in this rate

This unit covers surface raceway LD5, measured per linear foot. The technician mounts small one-piece non-metallic surface raceway on the wall and snaps the cover closed. The rate covers the listed material, labor, and small tools. Fittings, boxes, and cable are separate units.

Includes

  • LD5-size raceway
  • adhesive / screw mount
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • elbows / tees / boxes
  • cable
  • tax / freight
  • after-hours, premium access, and hazardous-material handling
  • certification testing, programming, and commissioning unless stated

Build-up

Labor 0.07 hr × $60.00 wage and burden
$4.20
Material and small tools
$3.16
Direct rate (labor, material, and tools)
$7.36 / LF
Overhead 10% of direct
$0.74
Fee 10% of (direct and overhead)
$0.81
Loaded rate
$8.91 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.