Surface raceway LD5
$8.91 / LF
LV-134 · MasterFormat 27 05 33 · LF
What’s in this rate
This unit covers surface raceway LD5, measured per linear foot. The technician mounts small one-piece non-metallic surface raceway on the wall and snaps the cover closed. The rate covers the listed material, labor, and small tools. Fittings, boxes, and cable are separate units.
Includes
- LD5-size raceway
- adhesive / screw mount
- layout and installation described above
- stated material waste and small tools
Excludes
- elbows / tees / boxes
- cable
- tax / freight
- after-hours, premium access, and hazardous-material handling
- certification testing, programming, and commissioning unless stated
Build-up
- Labor 0.07 hr × $60.00 wage and burden
- $4.20
- Material and small tools
- $3.16
- Direct rate (labor, material, and tools)
- $7.36 / LF
- Overhead 10% of direct
- $0.74
- Fee 10% of (direct and overhead)
- $0.81
- Loaded rate
- $8.91 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
