Poured terrazzo place

$34.69 / SF

FL-165 · MasterFormat 09 66 00 · SF

What’s in this rate

This SF unit places poured cementitious terrazzo over prepared backing; the crew sets divider strips, places the mix, and levels the field. Precast treads and risers, grinding and polishing, epoxy terrazzo, tile terrazzo, and backing repair are separate units.

Includes

  • cementitious terrazzo binder and aggregate mix
  • divider-strip share and placement consumables
  • set divider strips, place mix, and level

Excludes

  • precast terrazzo tread or riser
  • field grinding and polishing
  • epoxy terrazzo systems
  • precast terrazzo tile
  • backing repair
  • after-hours work

Build-up

Labor 0.26 hr × $55.00 wage and burden
$14.30
Material and small tools
$14.37
Direct rate (labor, material, and tools)
$28.67 / SF
Overhead 10% of direct
$2.87
Fee 10% of (direct and overhead)
$3.15
Loaded rate
$34.69 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.