TPO 45-mil fleeceback adhered
$310.67 / SQ
RF-186 · MasterFormat 07 54 00 · SQ
What’s in this rate
This unit covers TPO 45-mil fleeceback adhered, measured per square. The roofer stages the fleeceback membrane, spreads bonding adhesive, sets the sheet, and heat-welds field seams. The rate covers the listed material, 5.00% material waste, labor, and small tools. insulation, coverboard, mechanically fastened attachment, ballasted attachment, flashing, penetrations are separate units.
Includes
- 45-mil fleeceback TPO field membrane with bonding adhesive allocation
- layout, ordinary surface preparation, and installation described above
- stated material waste and small tools
Excludes
- insulation
- coverboard
- mechanically fastened attachment
- ballasted attachment
- flashing
- penetrations
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.6 hr × $65.00 wage and burden
- $104.00
- Material and small tools
- $152.75
- Direct rate (labor, material, and tools)
- $256.75 / SQ
- Overhead 10% of direct
- $25.68
- Fee 10% of (direct and overhead)
- $28.24
- Loaded rate
- $310.67 / SQ
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
