TPO 45-mil mech fastened

$273.76 / SQ

RF-081 · MasterFormat 07 54 00 · SQ

What’s in this rate

This unit is installing one TPO 45-mil mech fastened. The roofer preps the work area, completes the work as specified, and leaves the unit ready for the next operation. The rate is per square. Related field work, removals, and specialty transitions are separate units.

Includes

  • TPO 45-mil mech fastened material with waste
  • prep, layout, and application or set as specified
  • small tools

Excludes

  • removals / tear-off
  • unrelated field systems
  • substrate repair beyond preparation

Build-up

Labor 1.55 hr × $65.00 wage and burden
$100.75
Material and small tools
$125.50
Direct rate (labor, material, and tools)
$226.25 / SQ
Overhead 10% of direct
$22.62
Fee 10% of (direct and overhead)
$24.89
Loaded rate
$273.76 / SQ

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.