TPO 60-mil fleeceback mech
$333.66 / SQ
RF-201 · MasterFormat 07 54 00 · SQ
What’s in this rate
This unit covers TPO 60-mil fleeceback mech, measured per square. The roofer stages the fleeceback membrane, installs plates and fasteners to the deck pattern, and heat-welds field seams. The rate covers the listed material, 5.00% material waste, labor, and small tools. insulation, coverboard, adhered attachment, ballasted attachment, flashing, penetrations are separate units.
Includes
- 60-mil fleeceback TPO field membrane with plates and fasteners for mechanical attachment
- layout, ordinary surface preparation, and installation described above
- stated material waste and small tools
Excludes
- insulation
- coverboard
- adhered attachment
- ballasted attachment
- flashing
- penetrations
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.65 hr × $65.00 wage and burden
- $107.25
- Material and small tools
- $168.50
- Direct rate (labor, material, and tools)
- $275.75 / SQ
- Overhead 10% of direct
- $27.58
- Fee 10% of (direct and overhead)
- $30.33
- Loaded rate
- $333.66 / SQ
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
