TPO 80-mil mech-fastened
$343.94 / SQ
RF-171 · MasterFormat 07 54 00 · SQ
What’s in this rate
This unit covers TPO 80-mil mech-fastened, measured per square. The roofer stages the membrane, installs plates and fasteners to the deck pattern, and heat-welds field seams. The rate covers the listed material, 5.00% material waste, labor, and small tools. Insulation, coverboard, adhered or ballasted attachment, flashing, penetrations are separate units.
Includes
- 80-mil TPO field membrane with plates and fasteners for mechanical attachment
- layout, ordinary surface preparation, and installation described above
- stated material waste and small tools
Excludes
- insulation
- coverboard
- adhered or ballasted attachment
- flashing
- penetrations
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.7 hr × $65.00 wage and burden
- $110.50
- Material and small tools
- $173.75
- Direct rate (labor, material, and tools)
- $284.25 / SQ
- Overhead 10% of direct
- $28.42
- Fee 10% of (direct and overhead)
- $31.27
- Loaded rate
- $343.94 / SQ
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
