TPO 80-mil mech-fastened

$343.94 / SQ

RF-171 · MasterFormat 07 54 00 · SQ

What’s in this rate

This unit covers TPO 80-mil mech-fastened, measured per square. The roofer stages the membrane, installs plates and fasteners to the deck pattern, and heat-welds field seams. The rate covers the listed material, 5.00% material waste, labor, and small tools. Insulation, coverboard, adhered or ballasted attachment, flashing, penetrations are separate units.

Includes

  • 80-mil TPO field membrane with plates and fasteners for mechanical attachment
  • layout, ordinary surface preparation, and installation described above
  • stated material waste and small tools

Excludes

  • insulation
  • coverboard
  • adhered or ballasted attachment
  • flashing
  • penetrations
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 1.7 hr × $65.00 wage and burden
$110.50
Material and small tools
$173.75
Direct rate (labor, material, and tools)
$284.25 / SQ
Overhead 10% of direct
$28.42
Fee 10% of (direct and overhead)
$31.27
Loaded rate
$343.94 / SQ

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.