Trap primer distribution

$204.73 / EA

PL-089 · MasterFormat 22 13 00 · EA

What’s in this rate

Install one distribution trap-primer assembly and connect the primer outlets to the specified drains. The rate is per each installed unit.

Includes

  • distribution trap primer
  • distribution fittings/lines share
  • mount/connect/commission
  • small tools

Excludes

  • electronic trap primer
  • mechanical single-outlet primer
  • floor drain body
  • new branch rough

Build-up

Labor 0.75 hr × $72.00 wage and burden
$54.00
Material and small tools
$115.20
Direct rate (labor, material, and tools)
$169.20 / EA
Overhead 10% of direct
$16.92
Fee 10% of (direct and overhead)
$18.61
Loaded rate
$204.73 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.