Urinal wall-hung
$704.34 / EA
PL-005 · MasterFormat 22 42 00 · EA
What’s in this rate
This unit is setting and connecting one wall-hung commercial urinal. The plumber hangs the fixture, connects the flushometer supply and waste to the rough-in, and trims. The rate is per each urinal. Carriers, rough piping, and water closets are separate units.
Includes
- wall-hung commercial urinal fixture
- flushometer / supply connect allowance
- waste connect to rough-in
- set, level, and hang
- small tools
Excludes
- carrier / chair carrier rough
- domestic water / DWV rough beyond fixture connect
- water closet (see water-closet-floor-commercial / water-closet-wall-hung)
Build-up
- Labor 2.25 hr × $72.00 wage and burden
- $162.00
- Material and small tools
- $420.10
- Direct rate (labor, material, and tools)
- $582.10 / EA
- Overhead 10% of direct
- $58.21
- Fee 10% of (direct and overhead)
- $64.03
- Loaded rate
- $704.34 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
