Urinal wall-hung

$704.34 / EA

PL-005 · MasterFormat 22 42 00 · EA

What’s in this rate

This unit is setting and connecting one wall-hung commercial urinal. The plumber hangs the fixture, connects the flushometer supply and waste to the rough-in, and trims. The rate is per each urinal. Carriers, rough piping, and water closets are separate units.

Includes

  • wall-hung commercial urinal fixture
  • flushometer / supply connect allowance
  • waste connect to rough-in
  • set, level, and hang
  • small tools

Excludes

  • carrier / chair carrier rough
  • domestic water / DWV rough beyond fixture connect
  • water closet (see water-closet-floor-commercial / water-closet-wall-hung)

Build-up

Labor 2.25 hr × $72.00 wage and burden
$162.00
Material and small tools
$420.10
Direct rate (labor, material, and tools)
$582.10 / EA
Overhead 10% of direct
$58.21
Fee 10% of (direct and overhead)
$64.03
Loaded rate
$704.34 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.