W18 wide flange beam
$30.66 / LF
SS-004 · MasterFormat 05 12 00 · LF
What’s in this rate
This unit covers W18 wide flange beam, measured per linear foot. The ironworker shakes out, hoists, and installs the W18 wide-flange beam to line and elevation. The rate covers the listed material, 5.00% material waste, labor, and small tools. Other WF beam sizes, columns, HSS, field connections, and structural-steel bolt-up are separate units.
Includes
- fabricated W18 WF beam delivery allocation
- field bolts / consumables share
- layout and installation described above
- stated material waste and small tools
Excludes
- other WF beam sizes
- columns / HSS
- moment, shear, clip, seated, end-plate connections
- structural-steel-bolt-up (TN)
- paint-structural-steel-* / paint-intumescent-steel
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.11 hr × $58.00 wage and burden
- $6.38
- Material and small tools
- $18.96
- Direct rate (labor, material, and tools)
- $25.34 / LF
- Overhead 10% of direct
- $2.53
- Fee 10% of (direct and overhead)
- $2.79
- Loaded rate
- $30.66 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
