W8 wide flange beam

$13.81 / LF

SS-D1-001 · MasterFormat 05 12 00 · LF

What’s in this rate

This unit covers W8 wide flange beam, measured per linear foot. The ironworker shakes out, hoists, and installs the W8 wide-flange beam to line and elevation. The rate covers the listed material, 5.00% material waste, labor, and small tools. Other WF beam sizes, columns, HSS, field connections, and structural-steel bolt-up are separate units.

Includes

  • fabricated W8 WF beam delivery allocation
  • field bolts / consumables share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • other WF beam sizes (wf-beam-w12…w30 live)
  • columns / HSS
  • moment, shear, clip, seated, end-plate connections
  • structural-steel-bolt-up (TN)
  • paint-structural-steel-* / paint-beam-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.06 hr × $58.00 wage and burden
$3.48
Material and small tools
$7.93
Direct rate (labor, material, and tools)
$11.41 / LF
Overhead 10% of direct
$1.14
Fee 10% of (direct and overhead)
$1.26
Loaded rate
$13.81 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.