ACT grid heavy-duty 15/16
$11.12 / LF
ACT-027 · MasterFormat 09 53 00 · LF
What’s in this rate
This unit is installing one linear foot of heavy-duty 15/16-inch ACT suspension grid, with main or cross tee share amortized along the run. The carpenter cuts, hangs, and levels the grid ready for tile. Tile, supplemental bracing, and full layout are separate units.
Includes
- heavy-duty 15/16 grid with 5% waste and hanger share
- hanger share amortized
- cut, hang, and level grid
- small tools
Excludes
- tile; seismic engineering; supplemental bracing; full layout beyond share; after-hours
Build-up
- Labor 0.105 hr × $55.00 wage and burden
- $5.78
- Material and small tools
- $3.41
- Direct rate (labor, material, and tools)
- $9.19 / LF
- Overhead 10% of direct
- $0.92
- Fee 10% of (direct and overhead)
- $1.01
- Loaded rate
- $11.12 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
