ACT seismic clip

$4.88 / EA

ACT-028 · MasterFormat 09 53 00 · EA

What’s in this rate

This unit is installing one ACT seismic clip at a prepared grid or tile location. The carpenter sets and secures the clip to restrain the ceiling assembly. Seismic engineering, bracing, hanger wire, hangers, tile, and grid are separate units.

Includes

  • seismic clip with 5% waste
  • set and secure clip at grid/tile location
  • small tools

Excludes

  • seismic engineering; bracing; hanger wire; seismic hanger; tile; grid; after-hours

Build-up

Labor 0.055 hr × $55.00 wage and burden
$3.02
Material and small tools
$1.02
Direct rate (labor, material, and tools)
$4.04 / EA
Overhead 10% of direct
$0.40
Fee 10% of (direct and overhead)
$0.44
Loaded rate
$4.88 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.