Closure brick
$15.76 / SF
MS-D2-013 · MasterFormat 04 21 00 · SF
What’s in this rate
This unit covers Closure brick, measured per square foot. The bricklayer lays Closure-size clay brick with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. modular brick, utility brick, soap brick, thin brick veneer are separate units.
Includes
- closure brick units
- mortar allocation
- tooled bed and head joints
- layout and installation described above
- stated material waste and small tools
Excludes
- veneer ties / anchors (masonry-wall-tie)
- flashing / weeps / mortar net
- paint-exterior-brick-acrylic
- other brick sizes as separate units
- soldier / header / rowlock courses as separate bands
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.14 hr × $52.00 wage and burden
- $7.28
- Material and small tools
- $5.75
- Direct rate (labor, material, and tools)
- $13.03 / SF
- Overhead 10% of direct
- $1.30
- Fee 10% of (direct and overhead)
- $1.43
- Loaded rate
- $15.76 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
