Soap brick

$19.33 / SF

MS-D2-014 · MasterFormat 04 21 00 · SF

What’s in this rate

This unit covers Soap brick, measured per square foot. The bricklayer lays soap brick in cavity construction with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. thin brick veneer (adhered), modular brick, closure brick, paint-exterior-brick-acrylic are separate units.

Includes

  • soap brick units
  • mortar allocation
  • tooled bed and head joints
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • thin brick veneer (adhered)
  • modular / closure brick
  • paint-exterior-brick-acrylic
  • veneer ties / flashing / weeps
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.18 hr × $52.00 wage and burden
$9.36
Material and small tools
$6.61
Direct rate (labor, material, and tools)
$15.97 / SF
Overhead 10% of direct
$1.60
Fee 10% of (direct and overhead)
$1.76
Loaded rate
$19.33 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.