Brick expansion joint

$13.90 / LF

MS-024 · MasterFormat 04 21 00 · LF

What’s in this rate

This unit covers Brick expansion joint, measured per linear foot. The bricklayer forms an expansion joint in the brick veneer or wall and installs the scoped filler or sealant. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU control joint, masonry control joint gasket, concrete expansion joint are separate units.

Includes

  • expansion joint opening in brick
  • backer rod / sealant or premolded filler as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • CMU control joint
  • concrete expansion joint
  • masonry control joint gasket only
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.15 hr × $52.00 wage and burden
$7.80
Material and small tools
$3.69
Direct rate (labor, material, and tools)
$11.49 / LF
Overhead 10% of direct
$1.15
Fee 10% of (direct and overhead)
$1.26
Loaded rate
$13.90 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.