Brick header course

$33.19 / LF

MS-026 · MasterFormat 04 21 00 · LF

What’s in this rate

This unit covers Brick header course, measured per linear foot. The bricklayer sets a header-course brick band with consistent projection and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick soldier course, brick rowlock sill, brick veneer, brick water table are separate units.

Includes

  • header-oriented face brick
  • mortar allocation
  • layout and tooling of header band
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • soldier course
  • rowlock sill
  • field brick veneer
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.35 hr × $52.00 wage and burden
$18.20
Material and small tools
$9.23
Direct rate (labor, material, and tools)
$27.43 / LF
Overhead 10% of direct
$2.74
Fee 10% of (direct and overhead)
$3.02
Loaded rate
$33.19 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.