Brick header course
$33.19 / LF
MS-026 · MasterFormat 04 21 00 · LF
What’s in this rate
This unit covers Brick header course, measured per linear foot. The bricklayer sets a header-course brick band with consistent projection and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick soldier course, brick rowlock sill, brick veneer, brick water table are separate units.
Includes
- header-oriented face brick
- mortar allocation
- layout and tooling of header band
- layout and installation described above
- stated material waste and small tools
Excludes
- soldier course
- rowlock sill
- field brick veneer
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.35 hr × $52.00 wage and burden
- $18.20
- Material and small tools
- $9.23
- Direct rate (labor, material, and tools)
- $27.43 / LF
- Overhead 10% of direct
- $2.74
- Fee 10% of (direct and overhead)
- $3.02
- Loaded rate
- $33.19 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
