Norman brick

$16.33 / SF

MS-D-011 · MasterFormat 04 21 00 · SF

What’s in this rate

This unit covers Norman brick, measured per square foot. The bricklayer lays Norman-size clay brick in running bond with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. modular brick, utility brick, engineer brick, king-size brick, brick veneer are separate units.

Includes

  • norman brick units
  • mortar allocation
  • tooled bed and head joints
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • veneer ties / anchors (masonry-wall-tie)
  • flashing / weeps / mortar net
  • paint-exterior-brick-acrylic
  • modular / utility / other size bricks as separate
  • soldier / header / rowlock courses as separate bands
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.15 hr × $52.00 wage and burden
$7.80
Material and small tools
$5.70
Direct rate (labor, material, and tools)
$13.50 / SF
Overhead 10% of direct
$1.35
Fee 10% of (direct and overhead)
$1.48
Loaded rate
$16.33 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.