Acoustic CMU wall
$21.30 / SF
MS-D-010 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers Acoustic CMU wall, measured per square foot. The bricklayer lays sound-absorbing or acoustic CMU units with careful joint work to preserve acoustic faces. The rate covers the listed material, 5.00% material waste, labor, and small tools. field CMU wall, paint-acoustic finishes, ACT acoustic ceilings, paint-cmu finishes are separate units.
Includes
- acoustic cmu wall units / block
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- field CMU wall
- paint-acoustic / ACT acoustic
- paint-cmu-*
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.14 hr × $52.00 wage and burden
- $7.28
- Material and small tools
- $10.32
- Direct rate (labor, material, and tools)
- $17.60 / SF
- Overhead 10% of direct
- $1.76
- Fee 10% of (direct and overhead)
- $1.94
- Loaded rate
- $21.30 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
