Acoustic CMU wall

$21.30 / SF

MS-D-010 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Acoustic CMU wall, measured per square foot. The bricklayer lays sound-absorbing or acoustic CMU units with careful joint work to preserve acoustic faces. The rate covers the listed material, 5.00% material waste, labor, and small tools. field CMU wall, paint-acoustic finishes, ACT acoustic ceilings, paint-cmu finishes are separate units.

Includes

  • acoustic cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • field CMU wall
  • paint-acoustic / ACT acoustic
  • paint-cmu-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.14 hr × $52.00 wage and burden
$7.28
Material and small tools
$10.32
Direct rate (labor, material, and tools)
$17.60 / SF
Overhead 10% of direct
$1.76
Fee 10% of (direct and overhead)
$1.94
Loaded rate
$21.30 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.