Brick pier

$282.66 / EA

MS-022 · MasterFormat 04 21 00 · EA

What’s in this rate

This unit covers Brick pier, measured per each. The bricklayer builds a brick pier or pilaster to the scoped height with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU pier, brick veneer, stone coping masonry are separate units.

Includes

  • face / backup brick for pier
  • mortar
  • layout, plumb, and tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • CMU pier
  • grout / rebar
  • cap / coping
  • shelf angle / steel
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 3 hr × $52.00 wage and burden
$156.00
Material and small tools
$77.60
Direct rate (labor, material, and tools)
$233.60 / EA
Overhead 10% of direct
$23.36
Fee 10% of (direct and overhead)
$25.70
Loaded rate
$282.66 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.