Brick pier
$282.66 / EA
MS-022 · MasterFormat 04 21 00 · EA
What’s in this rate
This unit covers Brick pier, measured per each. The bricklayer builds a brick pier or pilaster to the scoped height with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU pier, brick veneer, stone coping masonry are separate units.
Includes
- face / backup brick for pier
- mortar
- layout, plumb, and tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- CMU pier
- grout / rebar
- cap / coping
- shelf angle / steel
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 3 hr × $52.00 wage and burden
- $156.00
- Material and small tools
- $77.60
- Direct rate (labor, material, and tools)
- $233.60 / EA
- Overhead 10% of direct
- $23.36
- Fee 10% of (direct and overhead)
- $25.70
- Loaded rate
- $282.66 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
