Brick water table
$38.81 / LF
MS-049 · MasterFormat 04 21 00 · LF
What’s in this rate
This unit covers Brick water table, measured per linear foot. The bricklayer sets a brick water-table or projecting course with controlled projection and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick soldier course, brick header course, stone coping masonry, through-wall flashing masonry are separate units.
Includes
- projecting water-table brick
- mortar allocation
- layout, projection control, tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- soldier / header courses
- stone coping masonry
- flashing at water table as separate densify
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.4 hr × $52.00 wage and burden
- $20.80
- Material and small tools
- $11.27
- Direct rate (labor, material, and tools)
- $32.07 / LF
- Overhead 10% of direct
- $3.21
- Fee 10% of (direct and overhead)
- $3.53
- Loaded rate
- $38.81 / LF