Truss joint reinforcement CMU
$5.14 / LF
MS-048 · MasterFormat 04 22 00 · LF
What’s in this rate
This unit covers Truss joint reinforcement CMU, measured per linear foot. The bricklayer places truss-type joint reinforcement in the CMU bed joint as courses advance. The rate covers the listed material, 3.00% material waste, labor, and small tools. ladder joint reinforcement CMU, vertical rebar in CMU, masonry wall tie are separate units.
Includes
- truss-type joint reinforcement
- placement in CMU bed joint
- layout and installation described above
- stated material waste and small tools
Excludes
- ladder-type joint reinforcement
- vertical rebar
- wall ties
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.05 hr × $52.00 wage and burden
- $2.60
- Material and small tools
- $1.65
- Direct rate (labor, material, and tools)
- $4.25 / LF
- Overhead 10% of direct
- $0.42
- Fee 10% of (direct and overhead)
- $0.47
- Loaded rate
- $5.14 / LF