Cast stone banding

$64.32 / LF

MS-D-026 · MasterFormat 04 40 00 · LF

What’s in this rate

This unit covers Cast stone banding, measured per linear foot. The bricklayer sets a cast-stone horizontal band or course with mortar bedding and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast stone sill, cast stone coping, limestone veneer, brick soldier course are separate units.

Includes

  • cast-stone horizontal band / course units
  • setting mortar / bedding
  • shims and tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cast-stone-sill
  • cast-stone-coping
  • limestone veneer field
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.45 hr × $52.00 wage and burden
$23.40
Material and small tools
$29.75
Direct rate (labor, material, and tools)
$53.15 / LF
Overhead 10% of direct
$5.32
Fee 10% of (direct and overhead)
$5.85
Loaded rate
$64.32 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.