Cast stone banding
$64.32 / LF
MS-D-026 · MasterFormat 04 40 00 · LF
What’s in this rate
This unit covers Cast stone banding, measured per linear foot. The bricklayer sets a cast-stone horizontal band or course with mortar bedding and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast stone sill, cast stone coping, limestone veneer, brick soldier course are separate units.
Includes
- cast-stone horizontal band / course units
- setting mortar / bedding
- shims and tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- cast-stone-sill
- cast-stone-coping
- limestone veneer field
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.45 hr × $52.00 wage and burden
- $23.40
- Material and small tools
- $29.75
- Direct rate (labor, material, and tools)
- $53.15 / LF
- Overhead 10% of direct
- $5.32
- Fee 10% of (direct and overhead)
- $5.85
- Loaded rate
- $64.32 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
