Cast stone coping

$74.48 / LF

MS-D-027 · MasterFormat 04 40 00 · LF

What’s in this rate

This unit covers Cast stone coping, measured per linear foot. The bricklayer sets cast-stone coping on the wall with mortar bedding and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. stone-coping-masonry, brick coping, coping-metal-cap, roof-coping-*, parapet-coping are separate units.

Includes

  • cast-stone coping units
  • setting mortar / bedding
  • joint tooling and sealant allocation light
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • stone-coping-masonry (natural/stone)
  • brick-coping
  • coping-metal-cap / parapet-coping / roof-coping-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.45 hr × $52.00 wage and burden
$23.40
Material and small tools
$38.15
Direct rate (labor, material, and tools)
$61.55 / LF
Overhead 10% of direct
$6.16
Fee 10% of (direct and overhead)
$6.77
Loaded rate
$74.48 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.