Cast stone coping
$74.48 / LF
MS-D-027 · MasterFormat 04 40 00 · LF
What’s in this rate
This unit covers Cast stone coping, measured per linear foot. The bricklayer sets cast-stone coping on the wall with mortar bedding and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. stone-coping-masonry, brick coping, coping-metal-cap, roof-coping-*, parapet-coping are separate units.
Includes
- cast-stone coping units
- setting mortar / bedding
- joint tooling and sealant allocation light
- layout and installation described above
- stated material waste and small tools
Excludes
- stone-coping-masonry (natural/stone)
- brick-coping
- coping-metal-cap / parapet-coping / roof-coping-*
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.45 hr × $52.00 wage and burden
- $23.40
- Material and small tools
- $38.15
- Direct rate (labor, material, and tools)
- $61.55 / LF
- Overhead 10% of direct
- $6.16
- Fee 10% of (direct and overhead)
- $6.77
- Loaded rate
- $74.48 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
