Cast stone quoin

$107.09 / EA

MS-D3-027 · MasterFormat 04 72 00 · EA

What’s in this rate

This unit covers Cast stone quoin, measured per each. The bricklayer sets cast-stone quoin units at building corners. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick quoin, cast-stone banding, cast-stone header, limestone quoin are separate units.

Includes

  • stone / cast-stone / cultured-stone units as specified
  • mortar allocation as specified
  • setting and tooling described above
  • stated material waste and small tools

Excludes

  • brick-quoin
  • cast-stone banding / header
  • limestone quoin
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.85 hr × $52.00 wage and burden
$44.20
Material and small tools
$44.30
Direct rate (labor, material, and tools)
$88.50 / EA
Overhead 10% of direct
$8.85
Fee 10% of (direct and overhead)
$9.74
Loaded rate
$107.09 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.