Cast stone water table

$71.04 / LF

MS-D3-028 · MasterFormat 04 72 00 · LF

What’s in this rate

This unit covers Cast stone water table, measured per linear foot. The bricklayer sets cast-stone water-table course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick water table, cast-stone banding, limestone banding are separate units.

Includes

  • stone / cast-stone / cultured-stone units as specified
  • mortar allocation as specified
  • setting and tooling described above
  • stated material waste and small tools

Excludes

  • brick-water-table
  • cast-stone banding
  • limestone banding
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.48 hr × $52.00 wage and burden
$24.96
Material and small tools
$33.75
Direct rate (labor, material, and tools)
$58.71 / LF
Overhead 10% of direct
$5.87
Fee 10% of (direct and overhead)
$6.46
Loaded rate
$71.04 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.