Cast stone water table
$71.04 / LF
MS-D3-028 · MasterFormat 04 72 00 · LF
What’s in this rate
This unit covers Cast stone water table, measured per linear foot. The bricklayer sets cast-stone water-table course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick water table, cast-stone banding, limestone banding are separate units.
Includes
- stone / cast-stone / cultured-stone units as specified
- mortar allocation as specified
- setting and tooling described above
- stated material waste and small tools
Excludes
- brick-water-table
- cast-stone banding
- limestone banding
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.48 hr × $52.00 wage and burden
- $24.96
- Material and small tools
- $33.75
- Direct rate (labor, material, and tools)
- $58.71 / LF
- Overhead 10% of direct
- $5.87
- Fee 10% of (direct and overhead)
- $6.46
- Loaded rate
- $71.04 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
