CMU backup wall

$13.21 / SF

MS-D2-009 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers CMU backup wall, measured per square foot. The bricklayer lays CMU backup wall behind masonry veneer with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick veneer, limestone veneer, masonry wall tie, masonry cavity insulation, field CMU finish wall are separate units.

Includes

  • cmu backup wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • brick / stone veneer
  • masonry wall tie
  • masonry cavity insulation
  • paint-cmu-* finish face
  • grout / rebar
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.12 hr × $52.00 wage and burden
$6.24
Material and small tools
$4.68
Direct rate (labor, material, and tools)
$10.92 / SF
Overhead 10% of direct
$1.09
Fee 10% of (direct and overhead)
$1.20
Loaded rate
$13.21 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.