Reinforced CMU bond beam course

$28.59 / LF

MS-D2-010 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers Reinforced CMU bond beam course, measured per linear foot. The bricklayer places a reinforced CMU bond-beam course with mortar bedding and tooling. The rate covers the listed material, 5.00% material waste, labor, and small tools. cmu-bond-beam-block (unit), concrete-bond-beam (CIP), masonry-grout-place, horizontal rebar in CMU, CMU lintel block are separate units.

Includes

  • reinforced CMU bond-beam course units
  • mortar bedding
  • light rebar positioner allocation as scoped
  • joint tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cmu-bond-beam-block (unit only)
  • concrete-bond-beam (CIP)
  • masonry-grout-place / fine / coarse / pump
  • horizontal rebar densify (full LF)
  • CMU lintel block
  • CMU wall lay
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.28 hr × $52.00 wage and burden
$14.56
Material and small tools
$9.07
Direct rate (labor, material, and tools)
$23.63 / LF
Overhead 10% of direct
$2.36
Fee 10% of (direct and overhead)
$2.60
Loaded rate
$28.59 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.