Reinforced CMU bond beam course
$28.59 / LF
MS-D2-010 · MasterFormat 04 22 00 · LF
What’s in this rate
This unit covers Reinforced CMU bond beam course, measured per linear foot. The bricklayer places a reinforced CMU bond-beam course with mortar bedding and tooling. The rate covers the listed material, 5.00% material waste, labor, and small tools. cmu-bond-beam-block (unit), concrete-bond-beam (CIP), masonry-grout-place, horizontal rebar in CMU, CMU lintel block are separate units.
Includes
- reinforced CMU bond-beam course units
- mortar bedding
- light rebar positioner allocation as scoped
- joint tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- cmu-bond-beam-block (unit only)
- concrete-bond-beam (CIP)
- masonry-grout-place / fine / coarse / pump
- horizontal rebar densify (full LF)
- CMU lintel block
- CMU wall lay
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.28 hr × $52.00 wage and burden
- $14.56
- Material and small tools
- $9.07
- Direct rate (labor, material, and tools)
- $23.63 / LF
- Overhead 10% of direct
- $2.36
- Fee 10% of (direct and overhead)
- $2.60
- Loaded rate
- $28.59 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
