Ground-face CMU wall
$15.69 / SF
MS-D-002 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers Ground-face CMU wall, measured per square foot. The bricklayer lays architectural ground or honed-face CMU with aligned joints and tooled mortar. The rate covers the listed material, 5.00% material waste, labor, and small tools. split-face CMU wall, scored-face CMU wall, ribbed-face CMU wall, glazed CMU wall, paint-cmu finishes are separate units.
Includes
- ground-face cmu wall units / block
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- grout fill of cells
- vertical / horizontal rebar
- ladder / truss joint reinforcement
- bond beam course
- control joints, weeps, flashing
- paint / coating (paint-cmu-*)
- scored-face / ribbed-face / standard field CMU where this face is scoped
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.13 hr × $52.00 wage and burden
- $6.76
- Material and small tools
- $6.20
- Direct rate (labor, material, and tools)
- $12.96 / SF
- Overhead 10% of direct
- $1.30
- Fee 10% of (direct and overhead)
- $1.43
- Loaded rate
- $15.69 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
