Ground-face CMU wall

$15.69 / SF

MS-D-002 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Ground-face CMU wall, measured per square foot. The bricklayer lays architectural ground or honed-face CMU with aligned joints and tooled mortar. The rate covers the listed material, 5.00% material waste, labor, and small tools. split-face CMU wall, scored-face CMU wall, ribbed-face CMU wall, glazed CMU wall, paint-cmu finishes are separate units.

Includes

  • ground-face cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • grout fill of cells
  • vertical / horizontal rebar
  • ladder / truss joint reinforcement
  • bond beam course
  • control joints, weeps, flashing
  • paint / coating (paint-cmu-*)
  • scored-face / ribbed-face / standard field CMU where this face is scoped
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.13 hr × $52.00 wage and burden
$6.76
Material and small tools
$6.20
Direct rate (labor, material, and tools)
$12.96 / SF
Overhead 10% of direct
$1.30
Fee 10% of (direct and overhead)
$1.43
Loaded rate
$15.69 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.