CMU pilaster

$162.99 / EA

MS-D-004 · MasterFormat 04 22 00 · EA

What’s in this rate

This unit covers CMU pilaster, measured per each. The bricklayer builds an engaged CMU pilaster bonded into the wall with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU pier (freestanding), bond beam block course, grout-filled CMU cell, vertical rebar in CMU are separate units.

Includes

  • CMU units for engaged pilaster
  • Type S mortar
  • plumb and joint tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • freestanding CMU pier
  • grout fill and rebar
  • bond beam course
  • cap / coping
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 1.8 hr × $52.00 wage and burden
$93.60
Material and small tools
$41.10
Direct rate (labor, material, and tools)
$134.70 / EA
Overhead 10% of direct
$13.47
Fee 10% of (direct and overhead)
$14.82
Loaded rate
$162.99 / EA