Insulated CMU wall
$18.30 / SF
MS-D-009 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers Insulated CMU wall, measured per square foot. The bricklayer lays foam-insert or insulated CMU units in running bond with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. masonry cavity insulation, insulation-mineral-wool-cavity, field CMU wall, paint-cmu finishes are separate units.
Includes
- insulated cmu wall units / block
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- masonry cavity insulation board densify
- insulation-mineral-wool-cavity hub
- grout / rebar
- paint-cmu-*
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.13 hr × $52.00 wage and burden
- $6.76
- Material and small tools
- $8.37
- Direct rate (labor, material, and tools)
- $15.13 / SF
- Overhead 10% of direct
- $1.51
- Fee 10% of (direct and overhead)
- $1.66
- Loaded rate
- $18.30 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
