Insulated CMU wall

$18.30 / SF

MS-D-009 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Insulated CMU wall, measured per square foot. The bricklayer lays foam-insert or insulated CMU units in running bond with tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. masonry cavity insulation, insulation-mineral-wool-cavity, field CMU wall, paint-cmu finishes are separate units.

Includes

  • insulated cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • masonry cavity insulation board densify
  • insulation-mineral-wool-cavity hub
  • grout / rebar
  • paint-cmu-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.13 hr × $52.00 wage and burden
$6.76
Material and small tools
$8.37
Direct rate (labor, material, and tools)
$15.13 / SF
Overhead 10% of direct
$1.51
Fee 10% of (direct and overhead)
$1.66
Loaded rate
$18.30 / SF