Scored-face CMU wall
$13.78 / SF
MS-006 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers Scored-face CMU wall, measured per square foot. The bricklayer lays architectural scored-face CMU with aligned score lines and tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. ribbed-face CMU wall, standard 8 in CMU wall, paint-cmu finishes, sack rub CMU are separate units.
Includes
- scored-face cmu wall units / block
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- grout fill of cells
- vertical / horizontal rebar
- ladder / truss joint reinforcement
- bond beam course
- control joints, weeps, flashing
- paint / coating (paint-cmu-*)
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.12 hr × $52.00 wage and burden
- $6.24
- Material and small tools
- $5.15
- Direct rate (labor, material, and tools)
- $11.39 / SF
- Overhead 10% of direct
- $1.14
- Fee 10% of (direct and overhead)
- $1.25
- Loaded rate
- $13.78 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
