Scored-face CMU wall

$13.78 / SF

MS-006 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers Scored-face CMU wall, measured per square foot. The bricklayer lays architectural scored-face CMU with aligned score lines and tooled mortar joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. ribbed-face CMU wall, standard 8 in CMU wall, paint-cmu finishes, sack rub CMU are separate units.

Includes

  • scored-face cmu wall units / block
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • grout fill of cells
  • vertical / horizontal rebar
  • ladder / truss joint reinforcement
  • bond beam course
  • control joints, weeps, flashing
  • paint / coating (paint-cmu-*)
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.12 hr × $52.00 wage and burden
$6.24
Material and small tools
$5.15
Direct rate (labor, material, and tools)
$11.39 / SF
Overhead 10% of direct
$1.14
Fee 10% of (direct and overhead)
$1.25
Loaded rate
$13.78 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.