CMU pier
$220.10 / EA
MS-008 · MasterFormat 04 22 00 · EA
What’s in this rate
This unit covers CMU pier, measured per each. The bricklayer stacks and plumbs a CMU pier or column to the scoped height with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. grout-filled CMU cell, vertical rebar in CMU, CMU bond beam block, brick pier are separate units.
Includes
- CMU units for pier/column stack
- Type S mortar
- plumb and joint tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- grout fill and rebar
- bond beam course
- brick pier
- cap / coping
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 2.5 hr × $52.00 wage and burden
- $130.00
- Material and small tools
- $51.90
- Direct rate (labor, material, and tools)
- $181.90 / EA
- Overhead 10% of direct
- $18.19
- Fee 10% of (direct and overhead)
- $20.01
- Loaded rate
- $220.10 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
