CMU shear wall

$18.92 / SF

MS-D3-006 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers CMU shear wall, measured per square foot. The bricklayer lays CMU shear wall to the structural layout with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. loadbearing CMU wall, field CMU wall, concrete shear-wall formwork, grout and rebar companions are separate units.

Includes

  • CMU units / block as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • concrete-shear-wall-form
  • grout / rebar
  • paint-cmu-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.16 hr × $52.00 wage and burden
$8.32
Material and small tools
$7.32
Direct rate (labor, material, and tools)
$15.64 / SF
Overhead 10% of direct
$1.56
Fee 10% of (direct and overhead)
$1.72
Loaded rate
$18.92 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.