CMU control joint seal
$10.65 / LF
MS-D3-005 · MasterFormat 04 05 23 · LF
What’s in this rate
This unit covers CMU control joint seal, measured per linear foot. The bricklayer seals the CMU control joint with the specified sealant. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU control joint (unsealed), masonry control joint gasket, concrete control joint seal, masonry sealant joint are separate units.
Includes
- CMU units / block as specified
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- cmu-control-joint (unsealed)
- masonry-control-joint-gasket
- concrete-control-joint-seal
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.12 hr × $52.00 wage and burden
- $6.24
- Material and small tools
- $2.56
- Direct rate (labor, material, and tools)
- $8.80 / LF
- Overhead 10% of direct
- $0.88
- Fee 10% of (direct and overhead)
- $0.97
- Loaded rate
- $10.65 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
