CMU trash enclosure wall
$16.90 / SF
MS-D3-008 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers CMU trash enclosure wall, measured per square foot. The bricklayer lays CMU trash-enclosure walls with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. field CMU wall, CMU screen block, gates and hardware are separate units.
Includes
- CMU units / block as specified
- Type S mortar allocation
- bed and head joints with tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- gates / hardware
- cmu-screen-block
- paint-cmu-*
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.15 hr × $52.00 wage and burden
- $7.80
- Material and small tools
- $6.16
- Direct rate (labor, material, and tools)
- $13.96 / SF
- Overhead 10% of direct
- $1.40
- Fee 10% of (direct and overhead)
- $1.54
- Loaded rate
- $16.90 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
