CMU trash enclosure wall

$16.90 / SF

MS-D3-008 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers CMU trash enclosure wall, measured per square foot. The bricklayer lays CMU trash-enclosure walls with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. field CMU wall, CMU screen block, gates and hardware are separate units.

Includes

  • CMU units / block as specified
  • Type S mortar allocation
  • bed and head joints with tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • gates / hardware
  • cmu-screen-block
  • paint-cmu-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.15 hr × $52.00 wage and burden
$7.80
Material and small tools
$6.16
Direct rate (labor, material, and tools)
$13.96 / SF
Overhead 10% of direct
$1.40
Fee 10% of (direct and overhead)
$1.54
Loaded rate
$16.90 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.